3 June 2011

Perfect day for firing no. 16.......


6 am - sooo good to be alive



9 am -


6am start the firing with gas
9am turn off the gas and abandon firing at only 300 degrees

Putting the first pieces of wood in about 8am I noticed one of the kiln shelves which form the chamber floor has cracked and slipped. You can just see it in this photo. It has to come out. Unfortunately this is the shelf which supports the main prop holding up the shelves of pots. I can't risk continuing.

OH *!***!.*

All I can do now is cut the grass on this perfect summer day.

2 June 2011

firing tomorrow

Halelujah!

Summer has returned to Skye.

Firing tomorrow, Friday, pots out on Sunday, exhibition opens on Monday!

And I haven't mentioned the complete rebuild of the kiln. 

9 March 2011

Firing 14 - refiring most of firing 13

Another 5am start, pitch dark but starry. Gas burner on.
7am   100oC   gas up, weather is still, overcast and damp
9am   310oC   gas still on, damp wood, damp kiln, did not do a warm through yesterday, kiln steaming - low fat pots?
10am  480oC  gas off, hard work to keep this fire going. Am I tired? not really enjoying this
11am  616oC  south west breeze. Now the fire is more beguiling, it becomes a reason in itself to continue. The kiln has ceased steaming
noon   730oC
1pm    878oC   using large slab wood, strong s.w. breeze
1.30   1004oC  reducing for a good half hour
2pm   1024oC 
3pm   1088oC   first soda in. Cold s.w. wind blowing into fire mouth,
3.30pm              closed the big doors for shelter
4pm   1088oC    then at 4.05 up to 1126oC
5pm    1145oC
5.30    1165oC   Andrew stopped by, just to check that the flames were intentional
6pm    1166oC  
6.30    1200oC   cone 7 bending
7pm    1203oC   cone 8 bending, 7 down
7.30    1211oC
7.45    1187oC   cone 9 beginning, cone 8 down
8pm    1215oC
8.15    1220oC   cone 9 down, last big stoke, start clamming up the kiln, a few slivers of wood added during this.
9.15    1078oC

I didn't make a note of when I put the fire mouth door on, probably around 1000oC to assist the reduction. It made a big difference to the comfort of my knees which would be scalded without the door. It was along hard firing this one, the longest so far at 15 hours, damp wood, cold south westerly wind all having an effect. The rain held off. I thought that the wind in this direction would speed it up as it blows directly at the fire mouth, my perception is the opposite. Will have to try it again with drier wood.

happy kiln = happy potter,
  This was a much better firing, even though I could hardly walk the next day - 15 hours on concrete in the wrong shoes.
will post some results next.
I think this blog is getting repetitive, not enough crises with this kiln. By the look of the interior it will need a rebuild before the chimney wall slumps.
Meanwhile I have been planning an anagama firing at Higham Hall in Cumbria for November.

5 March 2011

Firing 13 - lucky for some

But not for me!
Work to go in 
















7am, 90oC after 2 hours, turn up the gas, cup of tea, breathe deep
Gorgeous day, Nice, easy and steady climb to 1200 then 15minutes of lost concentration and I never got it back above 1180. I knew the cones were telling me to keep going but after 13 hours the lure of fish and chips at the pub was too great (and there was a bit of applied pressure from R pushing me in that direction).

Lesson learned - instead of only another 2 hours to get to temperature I now have a whole 13 hour firing to do and on my own as R will be away. I think I'll go to 15 hours just to be sure. Have to say I'm hacked off. Not getting enough results to feed the passion. And to continue the misery, the kiln is showing distinct signs of ware, but that's another blog


Orton 7 8 9 & 10, obviously underfired, 9 should be well down
 However, I look at the photo of the sunrise and find there the consolation. 



16 February 2011

Meanwhile - vote for me,

 if you've not much else to do!



click on this link below
craft & design selected AWARDS

And I'll be a very happy potter,
cheers!

Firing 13 in the planning

The frustration of not firing for a couple of months is getting to me. I find that I start to lose sight of what I am aiming for in my work. This time I am planning to fill the kiln with about 50% sell-able wares and fewer but more focused test pieces.

 We took delivery of the new iron framework (Caledonian Sheet Metal works in Inverness).  The kiln now has a detachable firemouth door and vertical supports at the corners. This should minimise some of the movement from firing and unbuilding for packing.  I suspect that a complete rebuild will be in order next year, at which point I might as well increase the size, it just isn't big enough.



 The door is a sandwich of fibre/kiln shelf/fibre, tin foil and weldmesh on the outer face. Two pieces of vermiculite board on the side which I dismantle for packing. We'll see how well that survives over time.
Isn't it smart? But......

Daylight between chimney hood and roof as the filler has burned out, letting the rain in of course.

20 January 2011

www = wet wet wet

Wet weather
Wet wood
Wet work

Condensation on the outside of the workshop windows - yes the outside.
A forlorn damp kiln down in the garden.

On the bright side - a new iron framework for the kiln being welded together.
This will include a door for the fire mouth to protect the stoker's knees.

And another anagama firing in the planning to look forward to.

Not a bad start to the year.